300字范文,内容丰富有趣,生活中的好帮手!
300字范文 > 坝顶高程 crest elevation英语短句 例句大全

坝顶高程 crest elevation英语短句 例句大全

时间:2023-04-19 22:09:49

相关推荐

坝顶高程 crest elevation英语短句 例句大全

坝顶高程,crest elevation

1)crest elevation坝顶高程

1.The method to determine thecrest elevation of earth dam;土坝坝顶高程的确定方法

英文短句/例句

1.Abstract: The articles introduce the method of China and Germany; according to their conditions of natural geography environment and technique etc, to determine crest the elevation of earth dam.文章介绍我国及德国根据自然环境、术条件采用的确定土坝坝顶高程的方法。

2.Villagers are scrambling to pile sandbags onto the top of the dyke to raise it higher.村民们正急匆匆地在坝顶堆积沙袋以加高堤坝。

3.Study on thrust angles of high arch dam abutment during overloading超载过程中高拱坝坝肩推力角的研究

4.The deformation process curve of the Wanjiazhai dam crest exhibits many peaks.万家寨大坝坝顶各监测点的变形过程是多峰曲线。

5.Water power schemes (hydroelectric schemes) are of two types, high dams and low dams水力发电工程(水电工程)有高坝和低坝两种类型。

6.Treatment for Cracks in Existing Dam Body during Heightening of Danjiangkou Dam丹江口大坝加高工程中原坝体裂缝处理工艺

7.Study on Reinforcement Technology of Earth-Rock Dam of Danjiangkou丹江口大坝加高工程左岸土石坝加固技术研究

8.Approach To Random Simulation Methed about Construction Process of High Earth Rockfill Dams高土石坝施工过程随机模拟方法探讨

9.Xiaolangdi Dam project on the Yellow River is 154 meters high.黄河小小浪底大坝工程有154米高。

10.Study on Effects of Construction Proccess and Crack Inducor at the Upstream Base of High Arch Dam;施工过程及底缝对高拱坝的影响研究

11."The dam is 726 ft (221 m) high and 1,244 ft (379 m) long (along the crest) has a power capacity of 1,345 megawatts, and a volume of 4.4 million cu yd (3.36 million cu m). ""坝高221公尺,顶长379公尺,发电功率1,345兆瓦,蓄水量336万立方公尺。"

12.Research on Tailrace System of Tunnel with Sloping Ceiling in Right Bank Underground Hydropower Station;金沙江向家坝水电站右岸地下电站变顶高尾水系统研究

13.Damage of guardrails on crest of Zipingpu CFRD in Wenchuan earthquake and its enlightenment紫坪铺大坝坝顶护栏震损情况及启示

14.Analysis on Vertical Displacement Monitoring Data of Jicun Dam Crest纪村大坝坝顶垂直位移监测资料分析

15.Engineerng Measures for Increasing Stability against Sliding along the Base of Concrete Gravity Dams on Rock Foundation提高岩基混凝土重力坝沿坝底抗滑稳定性的工程措施

16.Researches in the Influence of Foundation Excavation on Engineering Properties of Foundation Rock in High Arch Dam;高拱坝坝基开挖对建基岩体工程特性影响的研究

17.The deformation monitoring items of the dam for Shanxi Hydropower Station include the elevation control network close to the dam area, plane control network of triangulation and trilateral, dam collimation line and settlement monitoring.珊溪水电站大坝变形监测项目包括近坝区高程控制网和平面边角控制网、坝视准线及沉陷观测。

18.The selection of seepage control route for two banks of GHP and its optimal design of curtain grouting高坝洲工程基坑岩溶漏水通道堵漏灌浆技术

相关短句/例句

freeboard of embankment坝顶超高

3)top elevation of dam坝顶标高

4)High Dams高坝工程

1.The Finite Element and Genetic Algorithm Used for Seepage Inverse Problem ofHigh Dams;采用遗传算法和有限元法进行高坝工程渗流反问题研究

5)crest level堤顶高程;顶高程

6)design crest leve设计坝顶标高

延伸阅读

坝顶坝顶dam crest防浪墙人行道重机轨道行道纲顶排水昔(a)(b)图2混凝土重力坝坝顶(蔡长金)bading坝顶(d am crest)坝的顶部结构。包括路面、防浪墙、边石、栏杆、排水沟、灯柱等。土石坝坝顶无交通要求时,坝顶宽度通常按照构造和施工要求决定,并应考虑汛期防汛抢险的要求,一般不小于3米。坝顶路面可采用单层砌石或铺一层密实的碎石、砾石。对高度在15米以下的土石坝,可用草皮路面。有交通要求时,坝顶宽度和路面,按交通要求设计,路面向两侧或一侧做成2一3%的横坡,以便排除雨水。有防浪墙时,坡向下游,并在坝顶下游侧设纵向排水沟,汇集雨水,经坡面排水沟排至下游(见图1)。混浆砌石防浪啧坝顶宽图1土石坝坝顶凝土坝项无交通等特殊要求时,坝顶宽一般不小于2米。坝顶通行车辆和闸门启闭机械时,按交通及吊车、门机等要求设计路面,路面设排水沟,用排水管将水排至上游或排入坝身排水设备中。混凝土重力坝的典型坝顶结构见图2o

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。