300字范文,内容丰富有趣,生活中的好帮手!
300字范文 > 近爆源既有隧道 existing tunnel in close explosion source英语短句 例句大全

近爆源既有隧道 existing tunnel in close explosion source英语短句 例句大全

时间:2022-12-17 02:24:08

相关推荐

近爆源既有隧道 existing tunnel in close explosion source英语短句 例句大全

近爆源既有隧道,existing tunnel in close explosion source

1)existing tunnel in close explosion source近爆源既有隧道

2)adjacent existing tunnel邻近既有隧道

英文短句/例句

1.Analysis of Effects of Excavation on Existing Adjacent Tunnels基坑开挖对邻近既有隧道的影响分析

2.Research on influence of excavating road trench slope on adjacent existing tunnel路堑边坡开挖对邻近既有隧道影响研究

3.Numerical Analysis of the Influence of Tunneling Blasting on the Existing Tunnel;邻近隧道爆破施工对既有隧道影响的数值分析

4.RESEARCH ON DEFORMATION BEHAVIOR OF EXISTING TUNNEL DUE TO ADJACENT SHIELD CONSTRUCTION既有隧道受邻近盾构施工作用的变形行为研究

5.Analysis of Vibration Velocity Maximum of the Linging of Existing Tunnel by the Blasting of the Tunnel Near-by邻近隧道爆破施工引起的既有隧道衬砌振动速度阈值分析

6.Study on the Response of Internal Forces and Deformations of Existing Pile Foundations to Tunneling;隧道近接施工引起邻近既有桩基的内力和变形研究

7.INFLUENCE OF SHIELD CONSTRUCTION OF ADJACENT LINE UPON EXISTING TUNNEL相邻线路盾构施工对既有隧道的影响

8.Tunneling Techniques of Open Cut in close quarters for Step Over a Existing Shield Tunneling明挖法隧道近距离跨越既有盾构隧道施工技术

9.Analysis of Construction Plan for Buildings Existing Close to Tunnel of Cocealed Trenching at Subway地铁暗挖隧道紧邻既有建筑物施工方案分析

10.The paper introduces the excavation of a tunnel which is adjacent to an existing electrified railway tunnel, the monitoring, protection and strengthening of the existing tunnel.介绍一座与既有电气化隧道相邻隧道的开挖、有隧道监测及其防护加固方法。

11.Research on the Influence of Existing Tunnel by the Blasting of the Tunnel Near-by and the Assess of Existing Tunnel s Safety;既有隧道受临近隧道爆破开挖影响及安全性评估研究

12.Analysis on response of existing tunnels due to adjacent tunneling in multi-layered soils层状地基中隧道开挖对临近既有隧道的影响分析

13.The Influence of Pile Foundation in Life-Cycle on Adjacent Existing Tunnel;桩基础全寿命期对邻近已有隧道的影响研究

14.Analysis of the Influence of Foundation Pit Excavation on the Adjacent Existing Tunnel近距离基坑开挖对下方既有隧道的影响研究

15.Analysis on Ground Deformation of an Extra-shallow Underground Street Tunnel Closely Passing over Existing Tunnels in Soft Ground软岩超浅埋近接跨越既有隧道地层变形分析

16.Safety Criterion of Blasting Vibration for Existing Tunnel in Close Explosion Source近爆源的既有隧道爆破振动之安全判据

17.Numerical Simulation of Shield Tunnel Passing under the Existing Subway Station盾构隧道近接下穿既有地铁车站的数值模拟

18.On analysis of theories for neighboring piles settlement caused by tunnel excavation隧道开挖引起邻近单桩沉降的理论解

相关短句/例句

adjacent existing tunnel邻近既有隧道

3)existing tunnel既有隧道

1.There are many influence factors in theexisting tunnel s security when the double line railroad tunnel is constructed,such as the geological condition of surrounding rock,water system,operation situation of theexisting tunnel,and the construct method of the double line tunnel.增建铁路复线时,需从围岩地质条件、水系环境、既有隧道运营情况及复线隧道的施工方法等方面综合考虑,对既有隧道安全性展开分析。

2.Based on the practice of usingexisting tunnel as urban mass transit alignment,a mathematic model is established.针对既有隧道改建为城市轨道交通线路的具体实践,建立以线路平面和纵断面设计控制点为约束条件,改建量平方和最小为目标函数,采用拉格朗日乘子法进行优化设计的方法,初步确定线路位置;建立线路贯通性与限界适应性分析的指标体系,并以此为基础,编制限界自动分析软件,确定最佳的线路设计位置,从而解决了既有隧道工程改用作城市轨道交通线路时线路贯通性和限界适应性的分析问题。

3.The appraisement method of material properties for concrete ofexisting tunnel structure is presented based on the project.混凝土材料性能劣化是当前隧道结构维护中面临的主要问题,从既有隧道结构维护的角度出发,总结归纳了混凝土碳化和氯离子侵蚀这两种能够影响混凝土材料性能的关键因素的作用机理,并依据工程实践过程,给出了既有隧道结构中混凝土材料性能的鉴定方法。

4)existing line tunnel既有线隧道

1.Xindacheng second-line tunnel was close to theexisting line tunnel.新大成二线隧道紧临既有线隧道,为确保既有线隧道和行车安全,采取了导坑超前三步开挖,中空大直径直眼掏槽,炮眼水压爆破和实时爆破振动监测等技术措施,安全完成了工程,全段施工进度达每月59 m。

5)existing tunnel "7381"既有"7381"隧道

6)existing shield tunnel既有盾构隧道

1.Three dimensional numerical simulation of construction of metro-stationexisting shield tunnel using open surface method;既有盾构隧道条件下明挖地铁车站施工的三维数值模拟

延伸阅读

黑潮及邻近水域合作研究黑潮及邻近水域合作研究KuroshioandAdjacentRegions,CooperativeStudyof对黑潮及其时空变化的调查研究计划。1964年在政府间海洋学委员会第三届大会上通过。1965年7月~1970年8月,进行了第一期现场调查,参加的国家或地区共10个,研究船40艘,其中日本派出的达27艘。这些船只都用于夏、冬季进行同步观测。从1967年起,四季都进行调查,各季度都保持了15~24艘研究船。第一期调查结束后,仍继续调查,直至1977年为止。调查的海域几乎遍及西北太平洋的低、中纬度区域,取得了丰硕的成果。主要包括:发现了黑潮的起源及其分支,亚热带、赤道海域水团,热带逆流绘制出海洋生产力图。到1975年,共收集和加工了435个航次的16727个海洋站的资料,出版了《CSK资料报告》328卷。1977年出版CSK图集7卷。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。