300字范文,内容丰富有趣,生活中的好帮手!
300字范文 > 隧道盾构施工 tunnel shield construction英语短句 例句大全

隧道盾构施工 tunnel shield construction英语短句 例句大全

时间:2024-01-03 23:33:44

相关推荐

隧道盾构施工 tunnel shield construction英语短句 例句大全

隧道盾构施工,tunnel shield construction

1)tunnel shield construction隧道盾构施工

英文短句/例句

1.Numerical Simulation of Influence of New Tunnel on Short Distance Parallel Old Tunnel during Shield Tunnelling;近距离平行隧道盾构施工对老隧道影响的数值模拟

2.Study on Construction Influences of Shield Tunnel Excavation to the Neighboring Buildings;城市地铁隧道盾构施工对邻近建筑影响研究

3.Tunneling Techniques of Open Cut in close quarters for Step Over a Existing Shield Tunneling明挖法隧道近距离跨越既有盾构隧道施工技术

4.Construction Techniques by Shield Tunneling Method in Upper-Soft Lower-Hard Ground上软下硬地层中盾构法隧道施工技术

5.INFLUENCE OF SHIELD CONSTRUCTION OF ADJACENT LINE UPON EXISTING TUNNEL相邻线路盾构施工对既有隧道的影响

6.On analysis of shield construction through existing subway in running tunnel盾构施工下穿既有地铁区间隧道分析

7.Study of the Segment Internal Force during the Construction of Shield Tunnel盾构隧道施工过程中管片内力的研究

8.PREDICTION OF GROUND DEFORMATION INDUCED BY SHIELD TUNNELING CONSTRUCTION盾构法隧道施工引起的土体变形预测

9.Overview of "Code for Construction and Acceptance of Shield Tunnelling Method" GB50446-《盾构法隧道施工与验收规范》GB50446-导读

10.On the cast-in-site method rapid construction technology for the road structure of shield highway tunnel盾构公路隧道道路结构现浇法快速施工技术

11.ANALYSIS AND REDUCTION MEASURES ON CONSTRUCTURE COST OF SHIELD TUNNEL隧道盾构法施工的成本分析和降低措施

12.Research on Structural Mechanics Characteristics of Segment in the Process of Shield Tunnel Construction;盾构隧道施工过程管片结构受力特征研究

13.Influence of Shield Tunnel Construction on Short Pile Foundation-Frame Structure盾构隧道施工对短桩基—框架结构的影响

14.This paper is based on the background of shield method in subway tunneling construction.本文以盾构法地铁隧道施工为工程背景。

15.The Research on the Construction Plan of the Shield Tunnel Crossing from the Top of the Mining Tunnel in Small-angle and Close Range;盾构隧道近距离小角度上穿已建暗挖隧道的施工方案研究

16.A Database for Risk Management in Shield Tunneling盾构隧道施工风险管理数据库系统开发

17.Analysis and Control for Upward Movement of Shield Tunnel during Construction;软土盾构隧道施工期上浮机理分析及控制研究

18.Study on the Influence Degree of Adjacent Construction of Three Parralell Shield Tunnels;三孔并行盾构隧道近接施工的影响度研究

相关短句/例句

shield tunnel construction盾构隧道施工

3)construction of shield tunneling method盾构法隧道施工

4)shield driven tunnel project盾构隧道工程

5)shield tunnel盾构隧道

1.Segment lining crack disease treatment in theshield tunnel;盾构隧道管片衬砌裂纹病害整治技术

2.Simulation on relaxation effect of vertical earth pressure forshield tunnels by particle flow code;盾构隧道垂直土压力松动效应的颗粒流模拟

3.Grope forshield tunnel construction induced ground maximal settlement;盾构隧道施工引起地面最大沉降探索

6)shield tunnels盾构隧道

1.Probe into construction method for connecting tunnel between twoshield tunnels;采用矿山法构筑区间盾构隧道渡线段的方案探讨

2.Taking theshield tunnels which go through adjacently the piled foundation of a building of 7 storeys for example,a two-dimensional numerical calculating model is established by using the finite ele- ment code RFPA~(2D).以盾构隧道穿越7层楼房桩基为例,利用RFPA2D有限元程序,建立二维平面计算模型,针对不同排桩情况考虑桩底载荷和桩侧载荷作用下桩的水平、竖直位移和桩身的应力变化,得到隧道穿越桩基时对桩的扰动,与规范法的结果较为一致,证明了有限元分析方法的可行性和可靠性。

延伸阅读

地铁区间隧道施工对桥基影响的空间效应分析在桥梁下面采用浅埋暗挖进行城市地铁工程的施工,施工难度和风险极大。随着城市地铁在我国的大量修建和蓬勃发展,这些工程将会越来越多甚至不可避免,如何保证施工过程中施工和桥梁的安全,已成为近年来学术界和工程界普遍关注的现实问题。鉴于此,针对北京地铁五号线和平西桥站~北土城东路站区间隧道下穿樱花西桥这一实际工程,借助ABAQUS软件,建立了桥基-隧道围岩相互作用的三维有限元模型,模拟了隧道施工过程中地下结构和桥基的施工效应。数值分析结果表明,在拟定的施工方案下,施工期间桥基和地下结构没有安全隐患,并取得了一些有意义的结论和建议,为该工程的实施提供了依据和指导作用。一、引言 随着城市地铁在我国的大量修建,施工过程中的环境土工危害已成为目前工程界和学术界关注的重点和热点。其中,如何预测施工过程对近邻桥基的影响是研究中的重要问题之一,这也是城市地铁工程中亟待解决的现实难题。针对北京地铁五号线和平西桥站~北土城东路站区间隧道在设计里程K15+347~K15+401范围内下穿小月河及樱花西桥这一工程背景,借助著名的ABAQUS有限元分析软件,建立了路面-桥基-隧道围岩相互作用的三维有限元模型,对小月河及樱花西桥下区间隧道的施工过程进行了三维弹塑性数值模拟分析,预测了区间隧道施工过程中围岩和桥基的施工响应及其安全状态,取得了一些有意义的结论与体会。图1 区间隧道-小月河-樱花西桥纵断面位置关系二、工程简介 和~北区间隧道范围为和平西桥站北端~北土城东路站南端,设计里程为K14+529~K15+401,全长872.1双线米,区间隧道在设计里程K15+347~K15+401范围内下穿小月河及樱花西桥。小月河自西向东横穿樱花园西街,河床两侧为浆砌片石挡墙,河床底部为10cm素混凝土铺面,河床宽度为14.9m,拱顶距小月河河床最小间距为6.614m。樱花西桥位于小月河上,桥长44.58m,桥面宽48m。结构形式为三跨简支梁,主跨15m,边跨7.5m,梁为宽腹钢筋混凝土T梁,桥台基础、桥墩基础为200级素混凝土,桥台、桥墩为75号浆砌块石,桥墩42.5m高程以上部位采用75号浆砌条石,桥面为14cm厚300级钢筋混凝土路面,隧道开挖拱顶距桥梁基础底分别为4.516m和4.477m。区间隧道下穿樱花西桥及小月河纵断面见图1所示,其平面位置关系见图2所示,图1、2中尺寸均为m。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。