300字范文,内容丰富有趣,生活中的好帮手!
300字范文 > 预留土堤 provided mud dyke英语短句 例句大全

预留土堤 provided mud dyke英语短句 例句大全

时间:2019-09-03 17:48:27

相关推荐

预留土堤 provided mud dyke英语短句 例句大全

预留土堤,provided mud dyke

1)provided mud dyke预留土堤

1.Study and application ofprovided mud dyke in deep excavation;深基坑开挖预留土堤理论研究及工程应用

2)pre-cooling roadbed预冷路堤土

1.For the problem of the stability of the Qinghai-Tibetan railway roadbed in permafrost region, a method ofpre-cooling roadbed before construction was put forward, and an analysis model used for tested roadbed was set up.针对青藏铁路多年冻土地区的路基稳定问题,提出了施工前预冷路堤土的思路,并建立了用于试验路段的分析模型。

3)remaining soils预留土体

4)reserved land预留土地

1.From the perspective of reducing engineering cost and the role of planning,this paper illustrates the need of reserving land along the rail and especially in the station area,discusses the factors that determine the scale ofreserved land around station; finally,this paper argues that the benefit of rail transit will come from the development of rail+ the reserved la.讨论了车站预留土地开发规模的确定因素,分析了轨道交通的受益对象。

5)remaining berm预留土台

1.1 tendering section by use of the top-down construction method,the deformation rules of underground diaphragm walls under three different longitudinal excavation widths of theremaining berm and with or without inclined bracing setting are compared through centrifuge model tests.以上海世博会世博轴及地下综合体工程1标段逆作法施工深大基坑为背景,通过离心模型试验对比研究了3种不同的预留土台纵向开挖宽度及有无斜抛撑情况下连续墙的变形规律;在此基础上,结合"时空效应"理论进行了数值计算分析,研究了斜抛撑对围护结构变形的控制作用。

6)remaining core soil in advance预留核心土

英文短句/例句

1.Stress analysis with reservation core soil of annular excavation on wall rock in sandstone section of hydraulic tunnel水工隧洞砂岩段围岩环形开挖预留核心土法受力分析

2.Analysis of Annular Pit with Core Rock Support Method Adopted in Large-scale Tunnel Construction留核心土环形开挖工法在隧道设计施工中的应用

3.EXPERIMENTAL STUDY ON FRAME JOINTS BETWEEN CONCRETE -FILLED STEEL TUBULAR CORE COLUMNS AND PRESTRESSED CONCRETE BEAMS UNDER REVERSED CYCLIC LOADS;钢管混凝土核心柱与预应力混凝土梁节点低周反复荷载试验研究

4.eccentrically-precompressed precast-concrete pile偏心预压混凝土预制桩

5.The period of retention of a company"s name as pre-approved is six months..预先核准的公司名称保留期为6个月

6.non-core funding (Extrabudgetary Resources)非核心资金(预算外资源)

7.noise barrier reserve预留作为设置隔声屏障的土地

8.Delonghi Core Talent Retention & Motivation System Study;德龙公司核心人才留用激励体系研究

9.Reservation and pre-burying of the crossing point between electromechanical and civil project of the expressway高速公路机电与土建工程交叉点预留预埋设计

10.centrifugal prestressed concrete pile离心预应力混凝土桩

11.Precast hollow concrete block预帛混凝土空心砌块

12.Research on Theory and Key Technologies of Construction Control for Long-Span PC Cable-Stayed Bridges and Sowfware Development;大跨度预应力混凝土斜拉桥施工控制理论与核心技术研究及软件开发

13.Residue Analysis Methods and Degradation Regularity of Dimethachlon in Tobacco Leaves and Soils烟叶及土壤中菌核净残留分析方法及消解规律

14.Mental Development and Self-psychological Intervention of Left-behind Middle School Students留守初中生心理发展状况调查及自我心理干预

15.Talking about the Employment and Management of Enterprise s Key Personnel--the Employment and Management of the Intellectuals;浅谈企业核心员工的留用和管理——知识分子的留用和管理

16.College Systematized Psychological Education Based on the Psychologic al Pretest System;以心理预测体系为核心的高校系统化心理教育

17.Check up with built-in pipe& hole& so on as per drawings during civil construction.依据图纸设计检查土建的予埋件预留空洞.

18.Analysis on Pipeline Settlement in Silt Soil and Application of Anticipated Settlement Method淤泥土中管道沉降分析及预留沉降量法的应用

相关短句/例句

pre-cooling roadbed预冷路堤土

1.For the problem of the stability of the Qinghai-Tibetan railway roadbed in permafrost region, a method ofpre-cooling roadbed before construction was put forward, and an analysis model used for tested roadbed was set up.针对青藏铁路多年冻土地区的路基稳定问题,提出了施工前预冷路堤土的思路,并建立了用于试验路段的分析模型。

3)remaining soils预留土体

4)reserved land预留土地

1.From the perspective of reducing engineering cost and the role of planning,this paper illustrates the need of reserving land along the rail and especially in the station area,discusses the factors that determine the scale ofreserved land around station; finally,this paper argues that the benefit of rail transit will come from the development of rail+ the reserved la.讨论了车站预留土地开发规模的确定因素,分析了轨道交通的受益对象。

5)remaining berm预留土台

1.1 tendering section by use of the top-down construction method,the deformation rules of underground diaphragm walls under three different longitudinal excavation widths of theremaining berm and with or without inclined bracing setting are compared through centrifuge model tests.以上海世博会世博轴及地下综合体工程1标段逆作法施工深大基坑为背景,通过离心模型试验对比研究了3种不同的预留土台纵向开挖宽度及有无斜抛撑情况下连续墙的变形规律;在此基础上,结合"时空效应"理论进行了数值计算分析,研究了斜抛撑对围护结构变形的控制作用。

6)remaining core soil in advance预留核心土

延伸阅读

堤堤1.鸟群飞貌。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。