300字范文,内容丰富有趣,生活中的好帮手!
300字范文 > 双线铁路隧道 double-line railway tunnel英语短句 例句大全

双线铁路隧道 double-line railway tunnel英语短句 例句大全

时间:2021-02-08 18:27:00

相关推荐

双线铁路隧道 double-line railway tunnel英语短句 例句大全

双线铁路隧道,double-line railway tunnel

1)double-line railway tunnel双线铁路隧道

英文短句/例句

1.The Limits for Installing Mechanical Ventilation in Railway Double Track Tunnels on Diesel Traction Lines;内燃牵引双线铁路隧道设置机械通风的界限

2.The Test Study of the Surrounding Rock Pressure Acting on the Composite Lining in Weak Rock of Nanling Double Track Railway Tunnel南岭双线铁路隧道软岩复合式衬砌围岩压力的试验研究

3.Study on Construction Technique for Two Line Large Span Railway Tunnel with Shallow Depth and Its Deformation Control;浅埋大跨度双线铁路隧道施工技术及变形控制技术研究

4.Construction Technology for the Loess Large-section Dual-line Railway Tunnel with Median Septum Excavation中隔壁法开挖修建黄土大断面双线铁路隧道施工工艺

5.Application of the Construction of Double-line and Large Span Railway Tunnel with the Method of CRDCRD法在双线大跨铁路隧道中的应用

6.An Improvement on the Construction Process of Double-tracked–Single Bore Long Tunnel新建铁路长大隧道“单洞双线轨道运输”工序改良

7.Study on Construction Technology of the Soft Rock Tunnel Passing Througy Existing Railway;穿越既有铁路的软弱围岩双线隧道施工技术

8.Construction technology of the shallow two ways railway tunnel in city building dense area城市建筑密集区浅埋铁路双线隧道的施工工法

9.Research on Mechanical Characteristic of Fabricated Lining of High Speed Railway Longspan Two-Line Tunnel Constructed with Mining Method;高速铁路大跨度双线隧道矿山法施工的装配式衬砌力学特性研究

10.On double-block ballastless track construction technology of Chang-Da railway tunnel长大铁路隧道内双块式无砟轨道施工技术

11.Construction Techniques for Ballastless Rail Road Bed in Extra-long Single Track Tunnel特长单线铁路隧道无砟轨道道床施工技术

12.Dynamic Responses and Blast Resistance of Two-way Subway Tunnels Subjected to Explosion Load Inside One-sided Tunnel;单侧隧道内爆炸荷载作用下双线地铁隧道的动力响应与抗爆分析

13.Study on Stress Theory of Double Tunnel Construction by Horizontal Frozen Mining Method水平冻结暗挖地铁双线隧道受力机理研究

14.MODEL TEST ON DISPLACEMENT FIELD OF DOUBLE-ROUTE METRO CONSTRUCTED WITH HORIZONTAL FREEZING METHOD地铁双线隧道水平冻结位移场的模型试验

15.Numerical analysis of moisture,thermal and mechanical states for subway double-line tunnel constructed by artificial freezing method地铁双线隧道施工人工冻结水热力数值分析

16.Surrouding Rock Mechanical Response Study on Three-Lane Railway Tunnel with Large-Span;三线铁路大跨度隧道围岩力学响应研究

17.Research on Optimization of the Cross-section of the Single-track High Speed Railway Tunnel and Tunnel Hood;高速铁路单线隧道断面优化及缓冲结构研究

18.Discussion on the construction craft of tunnel in passenger dedicated highway line underpasses through established railway pipe roof客运专线隧道下穿既有铁路管幕施工技术

相关短句/例句

two way railway tunnel铁路双线隧道

1.This paper presents the study results on the aerodynamic characteristics fortwo way railway tunnel ventilation,which include the combine characteristics of jet fan used,the influence of the piston wind in the tunnel and the concentration distribution and the dilution principle of harmful gases.对铁路双线隧道通风的空气动力特性:射流风机的组合特性、活塞风的影响、有害气体浓度分布和稀释原理等进行了分析研究。

3)double-tube parallel tunnels双线地铁隧道

4)3-track railway tunnel三线铁路隧道

5)Single-line Tunnel单线铁路隧道

6)railway tunnel铁路隧道

1.Reasons analysis and treatment technique of leakage water in onerailway tunnel;某铁路隧道渗漏水的原因分析与治理技术

2.Analysis on the project quality management in the construction ofrailway tunnel;浅析铁路隧道施工中的工程质量管理

3.Application of steel fiber sprayed concrete with machine-processed sands torailway tunnel;机制砂钢纤维喷射混凝土在铁路隧道中的应用

延伸阅读

丹那铁路隧道位于日本东海道铁路干线上,在本州岛南部热海和函南之间的双线铁路隧道,轨距为1067毫米。丹那铁路隧道于19开工,1934年建成,长为7.8公里,海拔79米,最大埋深 549米。隧道内线路坡度为2.27~3.23‰。隧道通过的地层为安山岩、火山砾岩、火山粗砂和膨胀性温泉余土等。这座隧道用上、下导坑法开挖。施工过程中,曾多次发生塌方和夹带大量流泥的高压涌水事故。隧道内塌方曾引起地表沉陷;隧道内涌水水量有时高达每分钟85吨,涌水水压有时高达21千克力/厘米2,涌出泥砂、碎石有时多达3800立方米,曾使迂回导坑进口埋没。据统计,隧道施工中死亡人数共67人。此外,隧道施工期内发生的关东大地震和伊豆大地震,对工程也造成了严重的危害,如伊豆大地震引起位于断层处的排水导坑发生南北向大错动。为了解决防水问题,施工中采取了许多措施,如采用压注水玻璃、水泥浆,以及开挖大量排水导坑(有些地段排水用平行短导坑竟达5条之多,部分地段还采用过气压盾构施工)等措施。隧道通车后,线路限制坡度由25‰改缓为10‰,降低海拔378米,并缩短了里程。这座隧道附近有东海道新干线的新丹那铁路隧道,长约8公里,内铺标准轨距双线铁路,于1964年建成通车。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。